Sunday, February 24

Remodeling and Fishing Report


Last week was busy.  We were in Seattle and Lincoln City while the hallway floor was being finished.  Didn't have to smell the polyurethane and got to play with Nora and Amelia.

We met Pam and Doug in LC for two days of fishing on the Nestucca River. The girls talked and shopped.   I landed  a 24" and 28" steelhead.  Doug caught two and kept the really big 35" steelhead.

for more pictures    http://millerguideservice.com





 Tile in the bathroom is done.  The granite for the vanity in the bathroom was installed on Friday.  We are doing touch ups and trying to get a handle on the dust.  Carpet to be installed on Wednesday.